Projects
Delta Electrics has considerable experience in delivering power-related projects covering the full extent of a turn-key solution – design, supply, installation, testing and commissioning. We have delivered major projects for leading companies and organisations based in the NT including Power and Water Corporation and the Halikos Group.
Delta works closely with key suppliers such as Siemens, Eaton, Allight and Lightning Protection International to understand the specific needs of each client and deliver a project solution that will ensure these needs are met.
Our Projects expertise includes:
- Design of power generation systems (on-grid and off-grid)
- Design of power distribution systems (LV, MV and HV)
- Design of UPS, Surge and Lightning Protection systems
- Design of Earthing Systems
- Project management
Major projects
- PowerWater Katherine Zone Substation - a complete turn-key project supplying a purpose built substation building, civil works, access landings and building security. The substation includes a Siemens brand 22kV high voltage switchboard complete with system protection, low voltage ancillaries, arc-fault vent containment system and a state-of-the-art fire suppression system ($4 million)
- PowerWater Lovegrove Power Station – design, supply and installation of a 22kVswitchboard in a purpose-built zone substation building incorporating state-of-the-art Siemens technology in high voltage switchgear, protection and control design ($1.32 million)
- PowerWater McMinns Pumping Station – design, supply and installation of a 22kV switchboard in an upgraded zone substation building with high voltage switchgear, protection and control design ($1 million)
- PowerWater Casuarina Zone Substation - supply and install of switchgear for Power and Water's Casuarina Substation ($1 million)
- 130 The Esplanade Darwin – design, supply and install of 150kVA generator set ($150,000)
- Silcar/Telstra Katherine Telephone Exchange - DC equipment upgrade ($35,000)
- Silcar/Telstra Life Cycle Replacement Program - major upgrades to essential radio sites around WA/NT ($250,000 per annum)
- Bullo River Station – supply and install of a solar/diesel hybrid power station ($550,000)
- Bushlight - supply and install solar power systems to 8 aboriginal communities throughout the NT ($2.3 million)
- NT Department of Health Gove Health Clinic – major electrical works and supply/install of a standby generator ($68,000)
- Australian Department of Defence – supply and install of UPS devices, surge protection and switchboards for premises located in Darwin ($1.4 million)
- Federal Government Intervention Program/NT Police – supply/install of 17 generator sets to remote Aboriginal communities located throughout the NT ($1.2 million)